首页 | 本学科首页   官方微博 | 高级检索  
     检索      

兰渝铁路高地应力隧道变形控制的几点体会
引用本文:何磊.兰渝铁路高地应力隧道变形控制的几点体会[J].铁道建筑技术,2012(8):59-63.
作者姓名:何磊
作者单位:中国铁建十一局集团第四工程有限责任公司,武汉,430074
摘    要:兰渝铁路夏广段受青藏高原向北东持续扩展挤压作用,地层岩性变化大,地质构造十分复杂,处于高-极高地应力状态,隧道施工中极易发生大变形,施工中采用优化支护参数、恰当施工工法、提前释放应力等综合措施,达到安全施工的目的。

关 键 词:铁路隧道  薄层炭质板岩  高地应力  大变形  应力释放

Understanding about Deformation Control of Lan-Yu Railway Tunnels under High Geological Stress
He Lei.Understanding about Deformation Control of Lan-Yu Railway Tunnels under High Geological Stress[J].Railway Construction Technology,2012(8):59-63.
Authors:He Lei
Institution:He Lei(China Railway 11th Bureau Group Co.Ltd.,Wuhan 430074,China)
Abstract:Xiaguanying to Guangyuan part of the Lan-Yu Railway,as the Tibetan Plateau to northeast keep expanding and crush,the formation lithology changes a lot and the geologic structure is very complicated,The high or sky-high earth stress makes it vulnerable to big transmogrification.Parameters of anchor-plate retaining is optimized,the construction method is improved,to release stress before construction,etc.which ensures construction safely.
Keywords:railway tunnel  thin layer of carbonaceous slate  high In-situ  big transmogrification  stress release
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号