广州南站施工组织难点及对策措施
引用本文:卢胜坤.广州南站施工组织难点及对策措施[J].铁道建筑技术,2012(3):105-108.
作者姓名:卢胜坤
作者单位:中国铁建二十二局集团有限公司
摘    要:针对广州南站项目施工组织的特点及重难点,阐明了大型综合工程项目三通一平的重要性,水平和垂直运输应采取多种措施协调配合,在加强现场管理的前提下,要加大设备的投入,并重点介绍了吊模及纵横向行走式施工模架等施工方案。

关 键 词:客专车站  施工组织  方案研究

Difficulties in Construction Organization in Guangzhou South Station and Its Countermeasures
Lu Shengkun.Difficulties in Construction Organization in Guangzhou South Station and Its Countermeasures[J].Railway Construction Technology,2012(3):105-108.
Authors:Lu Shengkun
Institution:Lu Shengkun(China Railway 22th Bureau Group Co.Ltd.,Beijing 100043,China)
Abstract:In light of the characteristics and the key and difficult points in the construction of Guangzhou South station,the article elaborates the importance of three connections and one leveling,the coordination and cooperation between horizontal and vertical transportation,improvement of equipment input under the present condition with special importance give to the construction plan of module hoisting and longitudinal-transverse framing.
Keywords:railway station  construction organization  scheme study  construction plan