客运专线32m跨单箱双线造桥机节段拼装法施工
引用本文:任国辉.客运专线32m跨单箱双线造桥机节段拼装法施工[J].铁道建筑技术,2012(6):43-44,73.
作者姓名:任国辉
作者单位:中铁第五勘察设计院集团有限公司,北京,102600
摘    要:针对郑西客专磨沟河大桥应用KZ32-Ⅰ型双线上行悬吊式节段拼装造桥机建造铁路客运专线节段拼装双线箱梁、在地形条件复杂的相邻隧道间架梁等技术难点,提出相应的解决方案。

关 键 词:客运专线  双线箱梁  造桥机  施工技术

Passenger Dedicated Line 32 m Span Single Box Double Bridge Fabrication Machine Segmental Construction Method
Ren Guohui.Passenger Dedicated Line 32 m Span Single Box Double Bridge Fabrication Machine Segmental Construction Method[J].Railway Construction Technology,2012(6):43-44,73.
Authors:Ren Guohui
Institution:Ren Guohui(China Railway Fifth Survey and Design Institute Group Co.Ltd.,Beijing 102600,China)
Abstract:Technical solutions are proposed to solve technical difficulties of the application KZ32 type double uplink suspension type segmental bridge fabrication machine in the construction of railway passenger dedicated line precast segmental box beam line Zhengxi Railway Mogou River Bridge,beam erection between adjacent tunnels in complex terrain conditions and other technical difficulties.
Keywords:passenger dedicated line  double line box girder  erecting machine  construction technology