30米T梁吊装施工方案
引用本文:邓刚.30米T梁吊装施工方案[J].筑路机械与施工机械化,2008,25(10).
作者姓名:邓刚
作者单位:新疆北新路桥建设股份有限公司,新疆,乌鲁木齐,830018
摘    要:对安迪尔大桥施工的准备工作以及主要设备进行了介绍,同时给出了吊装方案以及注意事项;最后,对贝雷桁架组合式梁架桥机的有关部位承力进行了机体计算。实践证明,采取的施工方案是合理的,施工措施有效地保证了施工安全和工期,顺利地完成了施工任务,在以后的施工中可以借鉴。

关 键 词:T梁  吊装  施工  贝雷桁架

Construction Scheme for Hoisting of Thirty-meter T Beam
DENG Gang.Construction Scheme for Hoisting of Thirty-meter T Beam[J].Road Machinery & Construction Mechanization,2008,25(10).
Authors:DENG Gang
Abstract:The preparatory work and major equipment for the construction of Andel Bridge are introduced,the scheme for hoisting and caution are given.The force bearing of associated parts of Bailey Truss combined bridge ma- chine is calculated in the end.The practice proves that the scheme adopted is rational,the construction measure ef- fectively ensures the safety as well as time limit of construction and helps accomplish the task successfully,which can be referred in later construction.
Keywords:T beam  hoisting  construction  Bailey Truss