MTM在工厂规划前期的应用 |
| |
引用本文: | 金亚军,韩万宝,杨帆,于坤,黄超.MTM在工厂规划前期的应用[J].汽车实用技术,2021,46(7):190-191,201. |
| |
作者姓名: | 金亚军 韩万宝 杨帆 于坤 黄超 |
| |
作者单位: | 宁波吉利罗佑发动机零部件有限公司,浙江 宁波 315336 |
| |
摘 要: | 文章阐述MTM概念,对其过程模块中的MTM-UAS进行解析,描述如何将其应用于汽车变速器工厂规划前期人员劳动负荷评估中,确保新工厂规划前期人员数量评估合理性,避免工厂投产后人员浪费,提高运营效率。
|
关 键 词: | MTM MTM-UAS 人员劳动负荷 新工厂规划 |
Application of MTM in the Early Stage of Plant Planning |
| |
Authors: | Jin Yajun Han Wanbao Yang Fan Yu Kun Huang Chao |
| |
Institution: | (Zhejiang Geely Powertrain Co.,Ltd.,Zhejiang Ningbo 315336) |
| |
Abstract: | This paper expounds the concept of MTM,analyzes MTM-UAS,and describes how to apply MTM in the labor load assessment of the early planning of automobile transmission factory,so as to ensure the rationality of the personnel quantity assessment in the early planning of a new factory,avoid the personnel waste after production,and improve the operational efficiency. |
| |
Keywords: | MTM MTM-UAS Personnel load New plant planning |