首页 | 本学科首页   官方微博 | 高级检索  
     

大型耙吸挖泥船外海取砂装舱施工工艺优化
引用本文:陈少军,孙 慧,赵国权,钟 政,吕玉棋. 大型耙吸挖泥船外海取砂装舱施工工艺优化[J]. 水运工程, 2024, 0(5): 226-230
作者姓名:陈少军  孙 慧  赵国权  钟 政  吕玉棋
作者单位:中交上海航道局有限公司,上海 200002;中交疏浚技术装备国家工程研究中心有限公司,上海 200082
摘    要:针对厦门机场二期工程大型耙吸挖泥船外海取砂工效提升的目标,通过分析不同采砂区装舱溢流土质特性和现有取砂工艺问题,总结导致不同采砂区取砂装舱施工效率降低的主要原因,提出针对不同土质特性的外海取砂装舱施工优化工艺,并经实船测试和应用。结果表明,不同土质的取砂装舱工艺存在差异,对于易沉积、溢流损失小的土质条件,提升舱内平整度能够有效增加装舱土方量;对于难沉积、溢流损失大的土质条件,提升挖泥能力是提高取砂装舱效率的重要手段。

关 键 词:大型耙吸挖泥船;外海取砂;装舱施工;工艺优化

Technology optimization for sand extraction and loading construction in open sea by large trailing suction hopper dredger
CHEN Shaojun,SUN Hui,ZHAO Guoquan,ZHONG Zheng,LYU Yuqi. Technology optimization for sand extraction and loading construction in open sea by large trailing suction hopper dredger[J]. Port & Waterway Engineering, 2024, 0(5): 226-230
Authors:CHEN Shaojun  SUN Hui  ZHAO Guoquan  ZHONG Zheng  LYU Yuqi
Affiliation:CCCC Shanghai Dredging Co. ,Ltd. ,Shanghai 200002,China;CCCC National Engineering Research Center of Dredging Technology and Equipment Co. ,Ltd. ,Shanghai 200082,China
Abstract:In order to improve the efficiency of sand extraction in the open sea by large trailing suction hopper dredger in Xiamen Airport phase II project,we analyze soil characteristics of loading and overflow in different sand extraction areas and existing loading construction problems,and summarize main reasons for the reduction of construction efficiency in different sand extraction areas.Then we propose the optimization technology of sand extraction and loading construction in open sea according to different soil characteristics,which is verified and applied by the on-board test.The results show that there are differences in the sand extraction and loading technology of different soils.For the soil condition with easy deposition and small overflow loss,improving the flatness of cabin can effectively increase the loading soil volume.For the soil condition with difficult deposition and large overflow loss,promoting the ability of excavation is an important mean to improve the efficiency of sand extraction and loading.
Keywords:large trailing suction hopper dredger;sand extraction in open sea;loading construction;technology optimization
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号