南崖山隧道塌方段钢架变形应急处理技术
引用本文:杨文平,张立兴.南崖山隧道塌方段钢架变形应急处理技术[J].国防交通工程与技术,2014(4):46-49.
作者姓名:杨文平  张立兴
作者单位:中交一航局第四工程有限公司兰渝铁路项目部,天津300456
摘    要:在隧道施工中,拱架置换是处理隧道严重病害的一种有效防止措施,但其施工难度较大,无理论实践经验,技术流程也较复杂。针对兰渝铁路南崖山隧道出口DK490+100~DK490+082段边墙初期支护从切除至更换的施工全过程,介绍了软弱围岩侵限拱架置换施工的关键技术,分析了拱架置换施工的主要质量控制方法,为今后类似工程的施工提供了实践参考。

关 键 词:隧道  初期支护变形  侵限  拱架置换

The Emergency Treating Techniques for the Deformation of the Steel Supporting Racks in the Collapsing Section of the Nanyashan Tunnel
Yang Wenping,Zhang Lixing.The Emergency Treating Techniques for the Deformation of the Steel Supporting Racks in the Collapsing Section of the Nanyashan Tunnel[J].Traffic Engineering and Technology for National Defence,2014(4):46-49.
Authors:Yang Wenping  Zhang Lixing
Institution:(The Lan-Yu Railway Project Headquarters of the 4th Engineering Co. Ltd. of the First Navigation Bureau of the Communication Ministry of China,Tianjin 300456,China)
Abstract:In the construction of a tunnel,the replacement of arch racks is an effective preventive measure to deal with serious damage or defects of a tunnel.However,the construction of the replacement is relatively difficult to perform,there is no theoretical or practical experience for it,and its technical flow is also very complex.With the removal and replacement of the initial support and lining for the side walls in the outlet(DK490+100~DK490+082)section of the Nanyashan Tunnel of the Lan-Yu Railway as a practical example,key construction techniques for the replacement of arch racks in the sections of soft or weak surrounding rock are introduced in the paper,with the main quality control methods used for the construction of the replacement of the arch racks analyzed.The project may serve as a practical reference for the construction of other similar projects.
Keywords:tunnel  deformation of the initial support and lining  intrude the limits  replacement of the arch rack