首页 | 本学科首页   官方微博 | 高级检索  
     检索      


Coûts d’opportunité de construction des infrastructures routières et ferroviaires en Aquitaine pour la période 2007–2013 sous contrainte du Plan climat régional
Authors:J -C Martin  P Point
Institution:1. Laboratoire GREThA-UMR 5113, université Montesquieu-Bordeaux-IV, avenue Léon-Duguit, F-33600, Pessac, France
Abstract:The French Aquitaine region has implemented a climate plan to avoid 2,883 ktCO2eq for 2007–2013. Although this region reduced its greenhouse gas (GHG) emissions by 1,119 ktCO2eq between 1990 and 2005 (from 24,061 ktCO2eq to 22,942 ktCO2eq), GHG emissions of transports sector has increased by 762 ktCO2eq. During the climate plan period, the region will implement projects of road and rail infrastructures construction in order to absorb the foreseen increase of traffic. These projects will contribute to economic development, but they also will provoke additional GHG emissions. But, the existence of a climate plan requires offsetting these GHG emissions. A maximum amount of budget will be determined in order to implement some projects to offset GHG emissions from road and rail projects. This budget will be equal to opportunity costs of road and rail projects. Input-output analysis will be used to carry out these calculations. Its interest is to incorporate the complexity of interindustrial trade with a detailed sectored study.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号