峡江枢纽工程有限元抗滑稳定性研究*
引用本文:严 凌,吴 浪,付典龙,史涌泉.峡江枢纽工程有限元抗滑稳定性研究*[J].水运工程,2016(7):95-100.
作者姓名:严 凌  吴 浪  付典龙  史涌泉
作者单位:江西建设职业技术学院,江西 南昌 330200,江西科技师范大学 建筑工程学院, 江西 南昌 330013;南昌理工学院,江西 南昌 330031,南昌理工学院,江西 南昌 330031;江西省水利规划设计院, 江西 南昌 330029,南昌理工学院,江西 南昌 330031
基金项目:国家自然科学基金资助项目(51468022);江西省科技计划项目(20143BBM26112,2014BAB205018); 江西省教育厅科技项目(GJJ150812,GJJ151173,GJJ151175);江西科技师范大学重点培育实验室(研究基地)资助项目(300098010309);江西省教育厅教研项目(JXJG-14-25-1,JXJG-15-10-15)
摘    要:峡江水利枢纽工程岩体完整性差、抗冲能力较弱,应采取相应工程防护措施。对11闸段墩进行计算分析后得知,11闸段墩的抗滑稳定不满足规范要求。为此,采用非线性数值方法,对11闸墩的深层抗滑稳定安全系数进行校核,并运用有限元软件SAPTIS对11闸段墩段深层抗滑进行非线性有限元分析。根据分析结果,针对该缺陷提出加厚底板方案和锚筋桩方案,并得出结论——两种方案都能够满足抗滑稳定性要求。

关 键 词:泄水闸  非线性有限元  抗滑稳定  SAPTIS计算分析

Anti-sliding stability of Xiajiang hydro-junction project by finite element analysis
YAN Lin,WU Lang,FU Dian-long and SHI Yong-quan.Anti-sliding stability of Xiajiang hydro-junction project by finite element analysis[J].Port & Waterway Engineering,2016(7):95-100.
Authors:YAN Lin  WU Lang  FU Dian-long and SHI Yong-quan
Institution:Jiangxi College of Construction,Nanchang 330200,China,College of Architectural and Civil Engineering,Jiangxi Science and Technology Normal University,Nanchang 330013,China;Nanchang Institute of Technology,Nanchang 330031,China,Nanchang Institute of Technology,Nanchang 330031,China;Jiangxi Provincial Water Conservancy Planning and Designing Institute,Nanchang 330029,China and Jiangxi Provincial Water Conservancy Planning and Designing Institute,Nanchang 330029,China
Abstract:The Xiajiang hydro-junction project is featured with bad rock integrity and weak anti-scouring ability,so protective engineering measures shall be taken.Analyzing the No.11 sluice-pier,we know that the anti-sliding stability of No.11 sluice-pier cannot meet the requirements of relevant specification.Adopting the nonlinear numerical method,we check the safety factor of deep-layer anti-sliding stability of No.11 sluice-pier and conduct the nonlinear finite element analysis of it by SAPTIS.According to the analysis results,we propose two schemes,i.e.,thickening the bottom slab and arranging systematic anchor piles,both of which can meet the requirements of anti-sliding stability.
Keywords:discharge sluice  nonlinear finite element  anti-sliding stability  APTIS simulation analysis