首页 | 本学科首页   官方微博 | 高级检索  
     

手掘式顶进管道施工
引用本文:郭太龙. 手掘式顶进管道施工[J]. 交通标准化, 2011, 0(10): 30-32. DOI: 10.3869/j.issn.1002-4786.2011.10.009
作者姓名:郭太龙
作者单位:河北省邢台市路桥建设总公司,河北,邢台,054001
摘    要:顶管施工既能保证施工质量和工期,又能降低工程成本,且能够保证地面建筑设施的完好,保证道路交通的顺畅。从管道顶进的原理、设备及施工工艺方面叙述施工中的控制要点,并在此基础上指出施工中的注意事项,对类似工程具有一定的参考价值。

关 键 词:管道  非开挖  顶进施工

Pushing Pipe Construction with Manual Dig
GUO Tai-long. Pushing Pipe Construction with Manual Dig[J]. Communications Standardization, 2011, 0(10): 30-32. DOI: 10.3869/j.issn.1002-4786.2011.10.009
Authors:GUO Tai-long
Affiliation:GUO Tai-long(Xingtai Highway & Bridge Construction General Corporation of Hebei Province,Xingtai 054001,China)
Abstract:Pushing pipe construction can not only guarantee the construction quality and schedule,but also reduce the project cost,prevent the buildings from damaging and guarantee the smooth traffic.Given this,the principles,devices and construction technique are elaborated.On the basis the items deserving attention are proposed.It can provide reference for similar projects.
Keywords:pipe  trenchless technology  pushing pipe construction  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号