鄱阳湖大桥东塔基冻结法施工监理
引用本文:王银龙. 鄱阳湖大桥东塔基冻结法施工监理[J]. 交通标准化, 2011, 0(9): 126-130. DOI: 10.3869/j.issn.1002-4786.2011.09.041
作者姓名:王银龙
作者单位:浙江杭长高速公路有限公司,浙江,安吉,313300
摘    要:鄱阳湖大桥东塔基采用冷冻法施工在我国桥梁界尚属首例,桥址处的地质水文条件十分恶劣,施工难度较大。通过对鄱阳湖大桥东塔基冻结法施工监理进行研究,可为相关工程实践提供借鉴。

关 键 词:鄱阳湖大桥  冻结法  监理

Supervision of Freezing Method Construction in Poyang Lake Bridge East Tower Foundation
WANG Yin-long. Supervision of Freezing Method Construction in Poyang Lake Bridge East Tower Foundation[J]. Communications Standardization, 2011, 0(9): 126-130. DOI: 10.3869/j.issn.1002-4786.2011.09.041
Authors:WANG Yin-long
Affiliation:WANG Yin-long(Zhejiang Hang-Chang Expressway Co.,Ltd.,Anji 313300,China)
Abstract:It is the first case in China bridge sector to use the freezing method in construction of Poyang Lake Bridge east tower foundation,and the geological and hydrological conditions of bridge site are very adverse.It can provide reference for relational engineering practices through the research of supervision of freezing method construction in Poyang Lake Bridge east tower foundation.
Keywords:Poyang Lake Bridge  freezing method  supervision  