首页 | 本学科首页   官方微博 | 高级检索  
     

铁路客运专线提运架施工设备优化研究
引用本文:梁国军,韩同银,信雪爽. 铁路客运专线提运架施工设备优化研究[J]. 铁道建筑技术, 2008, 0(4): 1-3,16
作者姓名:梁国军  韩同银  信雪爽
作者单位:石家庄铁道学院经管分院,石家庄,050043
摘    要:在客运专线建设中,影响客运专线工期的重要因素就是关键设备的施工组织。通过对在建客运专线的调研,统计了客运专线的路基、桥梁、隧道等长度及比例,同时对在建客运专线的提运架设备投入情况进行了统计分析,并实地测量了运架作业时间,最后提出了客运专线提运架施工设备优化方案。

关 键 词:客运专线  施工设备  优化方案

Optimization Research on the Construction Equipment of Railway Passenger Dedicated Line
Liang Guojun,Han Tongyin,Xin Xueshuang. Optimization Research on the Construction Equipment of Railway Passenger Dedicated Line[J]. Railway Construction Technology, 2008, 0(4): 1-3,16
Authors:Liang Guojun  Han Tongyin  Xin Xueshuang
Affiliation:(Department of Economics & Management, Shijiazhuang Railway Institute, Shijiazhuang 050043, China)
Abstract:At present, the large-scale construction period has coming to the railway passenger dedicated line in an unprecedented way. In its construction, equipment plays a more and more important role, which is a decisive factor ensuring construction projects to be high speed, high quality with a low cost, consequently, a decisive factor ensuring the success of the construction projects. From the points of hoisting beam machine, beam carrier and bridge girder erection machine, this paper researched on the key construction equipment of railway passenger dedicated line. Firstly, through on-site research, the general situation of the railway passenger dedicated line was analyzed. Secondly, the input of beam machine, beam carrier and bridge girder erection machine was elaborated. Finally, on the basis of the analysis, the reasonable demanding quantity of hoisting beam machine, beam carrier and bridge girder erection machine of the railway passenger dedicated line was researched and put forward.
Keywords:the railway passenger dedicated line  construction equipments  optimization research