冲淤沉积层中新型咬合桩工法及应用
引用本文:周顺华,郑剑升,何泽刚,佘才高,包旭范. 冲淤沉积层中新型咬合桩工法及应用[J]. 中国铁道科学, 2006, 27(4): 57-61
作者姓名:周顺华  郑剑升  何泽刚  佘才高  包旭范
作者单位:1. 同济大学,道路与交通工程教育部重点实验室,上海,200092
2. 中铁二局集团,第五工程公司,四川,成都,610031
3. 南京地铁总公司,江苏,南京,210008
4. 上海市政工程设计研究院,上海,200092
摘    要:通过分析冲淤沉积层的特点和套管咬合桩的施工工艺,对套管咬合桩在冲淤沉积层中的扩径现象进行研究。指出在该地层中套管咬合桩施工产生扩径的主要原因是套管下沉对地层的扰动、周围土体向管内涌挤而产生的超挖和缓凝混凝土对地层的挤压扩张作用。提出利用水泥搅拌桩替代A序素混凝土桩,用有钢筋笼的B序桩咬合A序的水泥搅拌桩,形成钻孔桩咬合搅拌桩的一种新型咬合桩工法。该工法可以有效解决在冲淤沉积层中进行咬合桩施工时的扩径问题和止水问题。该工法在南京地铁西延线工程中得到应用,取得了较好的应用效果。

关 键 词:基坑工程  咬合桩工法  冲淤沉积层  搅拌桩  钻孔桩
文章编号:1001-4632(2006)04-0057-05
收稿时间:2005-08-09
修稿时间:2005-08-09

The Construction Method and Application of New-Style Secant Piles in Alluvium
ZHOU Shun-hua,ZHENG Jian-sheng,HE Ze-gang,SHE Cai-gao,BAO Xu-fan. The Construction Method and Application of New-Style Secant Piles in Alluvium[J]. China Railway Science, 2006, 27(4): 57-61
Authors:ZHOU Shun-hua  ZHENG Jian-sheng  HE Ze-gang  SHE Cai-gao  BAO Xu-fan
Affiliation:1. Key Laboratory of Road and Traffic Engineering of Ministry of Education, Tongji University, Shanghai 200092, China; 2. Department No. 5, China Railway Erju Group Corporation, Chengdu Sichuan 610031 China; 3. Nanjing Metro Corporation, Nanjing Jiangsu 210008, China; 4. Shanghai Municipal Engineering Design Institute, Shanghai 200092, China
Abstract:Based on the analysis of the construction technology of secant piles in alluvium,the phenomenon of hole enlargement is studied.The main reasons of hole enlargement occurred in alluvium are pointed out,which are the ground disturbance of pipe setup, overexcavation owing to surrounding soil squeezing to the pile pipe and extrusion of delayed coagulating concrete to ground.On this basis,a new construction method is put forward.The new method includes the points that the plain concrete piles of A order is substituted by cement mixing piles and that B order piles with reinforcement skeleton intersect A order cement mixing piles.The new method can solve the problems of hole enlargement and retaining groundwater efficiently.The new method has been used in Nanjing metro construction,and the application results are preferably satisfactory.
Keywords:Foundation pit engineering  Secant piles construction method  Alluvium  Mixing pile  Drilled pile