首页 | 本学科首页   官方微博 | 高级检索  
     

山钢莱芜分公司专用铁路编组站改造方案研究
引用本文:赵振刚. 山钢莱芜分公司专用铁路编组站改造方案研究[J]. 铁道货运, 2021, 0(2): 45-50
作者姓名:赵振刚
作者单位:中铁工程设计咨询集团有限公司济南设计院
基金项目:中铁工程设计咨询集团有限公司项目(2019-317)。
摘    要:专用铁路编组站改造是山东钢铁股份有限公司莱芜分公司新旧动能转换项目的控制工程之一,对于铁路运输组织、站场设施管理工作的提升具有重要意义.在阐述既有莱钢编组站站场设施和运输组织现状的基础上,结合钢铁新旧动能转换工程规划,分析莱钢编组站目前存在的无贯通正线、到发线有效长不足、卸车线有效长不足、站坪坡度超限等问题,提出莱钢编...

关 键 词:专用铁路  编组站  到发线有效长  平行进路  组合道岔

Study of Reconstruction Scheme of Marshalling Station for Deliciated Railway of Laiwu Branch for Shandong Iron&Steel Group
ZHAO Zhengang. Study of Reconstruction Scheme of Marshalling Station for Deliciated Railway of Laiwu Branch for Shandong Iron&Steel Group[J]. Railway Freight Transport, 2021, 0(2): 45-50
Authors:ZHAO Zhengang
Affiliation:(Ji'nan Design Institute,China Railway Engineering Design and Consulting Group Co.,Ltd.,Ji'nan 250022,Shandong,China)
Abstract:The reconstruction of marshalling station for dedicated railway is one of the control project of the New Dynamics Project of Laiwu branch of Shandong Iron and Steel Co.,Ltd.It is of great significance for improving railway transportation organization and station facility management.Based on elaborating the current status of the technical equipment and transportation organization of the marshalling station,four main problems are analyzed to meet the requirements of New Dynamics Project:no through main lines,insufficient effective length of arrival and departure lines,insufficient effective length of unloading lines,and overrun of the slope of the station site.On the basis of investigating and analyzing of various control reconstruction scheme factors,further study of reconstruction scheme of marshalling station has been done,including the main line plane,station yard plane and vertical section reconstruction scheme.By optimizing the layout of the main line,grouping the function of the arrival and departure line,fully setting parallel routes in throat area,adopting combined turnouts and increasing the slope of throat area and other design methods,the targeted reconstruction goal has been achieved,providing a reference for the reconstruction of the same type marshalling station for dedicated railway.
Keywords:Dedicated Railway  Marshalling Station  Effective Length of Arrival-departure Track  Parallel Route  Combined Turnout
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号