首页 | 本学科首页   官方微博 | 高级检索  
     检索      

广州地铁二号线三元里折返线隧道过桥技术
引用本文:李亚武.广州地铁二号线三元里折返线隧道过桥技术[J].铁道工程学报,2003(2):8-12.
作者姓名:李亚武
作者单位:中铁十三局集团第五工程有限公司,长春,130031
摘    要:隧道施工对桥基产生影响 ,为有效控制变形 ,确保架桥安全 ,对桥基托换。

关 键 词:隧道施工  桥基托换  钢管灌注桩  植筋
文章编号:1006-2106(2003)02-0008-05

TUNNEL BRIDGE-CROSSING TECHNIQUE FOR SANYUANLI TURN-BACK LINE ON NO.2 LINE OF GUANGZHOU SUBWAY
LI Ya,wu,The First Engineering Co. Ltd. of China Railway the thirteenth Engineering Group Corporation.TUNNEL BRIDGE-CROSSING TECHNIQUE FOR SANYUANLI TURN-BACK LINE ON NO.2 LINE OF GUANGZHOU SUBWAY[J].Journal of Railway Engineering Society,2003(2):8-12.
Authors:LI Ya  wu  The First Engineering Co Ltd of China Railway the thirteenth Engineering Group Corporation
Institution:LI Ya wu The First Engineering Co. Ltd. of China Railway the thirteenth Engineering Group Corporation
Abstract:Owing to the influence on bridge foundation made by tunnel construction, it is necessary to underpin the bridge foundation in order to control deformation and ensure the safety of bridging.
Keywords:tunnel construction  bridge foundation underpinning  steel pipe filling pile  establishing reinforcement
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号