首页 | 本学科首页   官方微博 | 高级检索  
     检索      

143.5 m高墩液压翻模施工技术
引用本文:刘宏选.143.5 m高墩液压翻模施工技术[J].铁道建筑技术,2006(5):26-28.
作者姓名:刘宏选
作者单位:中铁二十局集团第二工程有限公司,昆明,650200
摘    要:随着高墩施工技术的发展,特大桥建设越来越多,墩身施工采用何种方法,许多施工单位都在进行不同方式的尝试。143.5 m高墩采用液压翻模技术施工,取得了成功。详细介绍了143.5 m高墩施工工艺。

关 键 词:高墩  液压翻模  施工技术
文章编号:1009-4539(2006)05-0026-03
修稿时间:2006年4月6日

Molds Technique of 143.5 m High-pier Construction
Liu Hongxuan.Molds Technique of 143.5 m High-pier Construction[J].Railway Construction Technology,2006(5):26-28.
Authors:Liu Hongxuan
Abstract:Along with the technical development in high-piers,constructions of especially big bridges are becoming more and more.Many construction devisions are exploring various ways in high-piers body construction.And experiences of success are obtained in the molds technique of 143.5 m high-pier construction craft.This article introduces in detail the molds technique of 143.5 m high-pier construction craft.
Keywords:high pier  liquid press to turn over molds  construction technique  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号