首页 | 本学科首页   官方微博 | 高级检索  
     检索      

索塔锚固区U型钢束施工控制探讨
引用本文:余小勇.索塔锚固区U型钢束施工控制探讨[J].铁道建筑技术,2013(9):68-70,97.
作者姓名:余小勇
作者单位:中铁二十四局集团浙江工程有限公司 杭州 310009
摘    要:结合宁波市福明路跨铁路宁波东站斜拉桥索塔锚固区U型预应力筋张拉工艺模型试验,通过对索塔锚固区U型预应力筋施工控制研究,对此类预应力体系在斜拉桥索塔锚固区中的应用作了深入的探讨.

关 键 词:索塔  锚固区  U型钢束  试验  施工控制

Research on the Anchorage Zone of U Type Steel Beam Construction Control
Yu Xiaoyong.Research on the Anchorage Zone of U Type Steel Beam Construction Control[J].Railway Construction Technology,2013(9):68-70,97.
Authors:Yu Xiaoyong
Institution:Yu Xiaoyong;China Railway 24(th) Bureau Group Co. Ltd.;
Abstract:Combined with the extension model test of the U type prestressed tendon of cable-stayed bridge pylon anchorage zone of Ningbo Fuming Road overpassing Ningbo East Railway Station, through the research of construction control of cable pylon anchorage zone of U tendons, the application of the prestressed system in the anchorage zone of cable-stayed bridge is discussed in depth.
Keywords:cable support tower  anchorage zone  U type steel beam  test  construction control
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号