李子沟特大桥施工阶段抗风设计 |
| |
引用本文: | 张师岸.李子沟特大桥施工阶段抗风设计[J].铁道标准设计通讯,2003(7):44-47. |
| |
作者姓名: | 张师岸 |
| |
作者单位: | 中铁十八局集团有限公司工程管理部,天津300022 |
| |
摘 要: | 对李子沟特大桥主体结构施工时的临时设施进行抗风设计 ,增强临时设施的抗风性能 ;并对施工阶段主体结构的典型工况进行动力特性分析 ,计算风载内力 ,提出各施工阶段相应的抗风安全措施。
|
关 键 词: | 公路桥梁 抗风设计 动力特性 抖振 风载内力 措施 |
修稿时间: | 2003年5月12日 |
Wind Resistance Design for Lizigou Extra-large Bridge During its Construction |
| |
Abstract: | Wind resistance design was applied to the temporary structures of Lizigou Extra-large Bridge to increase its wind resistance. An analysis was made of dynamic property of main structure of the bridge under typical working conditions, and wind load internal force was calculated. Wind resistant measures were put forward at each construction stages. |
| |
Keywords: | highway bridge wind resistance design dynamic property buffeting wind load internal force measure |