地铁工程全生命周期造价的确定与控制
引用本文:王瑾.地铁工程全生命周期造价的确定与控制[J].铁路工程造价管理,2008,23(5):10-14.
作者姓名:王瑾
作者单位:天津地下铁道总公司,天津,300051
摘    要:通过对地铁工程项目全生命周期造价管理现状的分析,在项目组织集成的基础上,通过地铁工程项目利益相关者的诉求分析,合理确定项目的全生命周期工程造价,并以此作为控制地铁工程项目全生命周期造价的基础。

关 键 词:地铁工程  全生命周期造价  集成化组织管理模式  利益相关者

Cost determination and control of whole life cycle for metro projects
Wang Jin.Cost determination and control of whole life cycle for metro projects[J].Railway Engineering Cost Management,2008,23(5):10-14.
Authors:Wang Jin
Abstract:Through the analysis of the current status of cost management of whole life cycle for metro projects,and through the analysis of the complaints of the interest parties of metro projects based on the integration of project organization,this article reasonably determines the engineering cost of the whole life cycle of a project,which is used as the basis to control the cost of the whole life cycle of such projects.
Keywords:Metro project  cost of whole life cycle  integration of organization management mode  interest party