大型溶腔岩溶发育隧道处理方案分析
引用本文:李鸣冲. 大型溶腔岩溶发育隧道处理方案分析[J]. 铁路工程造价管理, 2006, 21(4): 42-45
作者姓名:李鸣冲
作者单位:铁道第四勘察设计院,湖北,武汉,430063
摘    要:通过对在建铁路某隧道所揭示溶腔结构处理与工程环境间的整体性、相关性及有序性分析,依照系统分析理论与方法,提出溶腔处理方案,对类似工程的溶腔处理有借鉴意义。同时,希望对于隧道工程建设要考虑工程结构本身及其赋存的环境间各个要素间的整体性、相关性和有序性.从而建设与环境和谐的隧道工程。

关 键 词:岩溶发育  隧道  处理方案
文章编号:1007-9890(2006)04-0042-04
收稿时间:2006-05-29
修稿时间:2006-05-29

Analysis of treatment scheme for large scale karst cavity developed tunnel
Li Mingchong. Analysis of treatment scheme for large scale karst cavity developed tunnel[J]. Railway Engineering Cost Management, 2006, 21(4): 42-45
Authors:Li Mingchong
Affiliation:Li Mingchong
Abstract:Through the analysis of globality, relativity and orderliness between the karst cavity structure and the engineering environment of a certain ongoing railway tunnel, this article tables a karst cavity treatment scheme based on the system analytical theory and methodology, which is of reference to works of similar nature. Simultaneously, it is hoped that the globality, relativity and orderliness among all the constituent elements between the engineering structure and the engineering environment should be considered when tunneling is carried out so that tunnels will be constructed in harmony with the environment.
Keywords:Karst development   tunnel   treatment scheme
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏