首页 | 本学科首页   官方微博 | 高级检索  
     

沥青拌和站一级回收粉系统改造
引用本文:李振国,王玉果. 沥青拌和站一级回收粉系统改造[J]. 交通标准化, 2010, 0(9): 35-38. DOI: 10.3869/j.1002-4786.2010.05.012
作者姓名:李振国  王玉果
作者单位:中交第一公路工程局有限公司,北京,100071
摘    要:通过分析原间歇式沥青拌和站粉尘含量高所带来的弊端,提出改进方案,对一级回收粉进行单独提升、储存和计量,并进行各项指标分析,可达到保证混合料质量稳定、提高生产效率和环保的目的。

关 键 词:一级粉尘装置  改进方案  效果分析

Reconstruction of Primary Dust Recovery System in Asphalt Mixing Plant
LI Zhen-guo,WANG Yu-guo. Reconstruction of Primary Dust Recovery System in Asphalt Mixing Plant[J]. Communications Standardization, 2010, 0(9): 35-38. DOI: 10.3869/j.1002-4786.2010.05.012
Authors:LI Zhen-guo  WANG Yu-guo
Affiliation:CCCC First Highway Engineering Co./a>;Ltd./a>;Beijing 100071/a>;China
Abstract:By analyzing the flaws caused by high content of bug dust produced in batch asphalt mixing plant,the improved scheme is proposed,which is to lift,store and measure the primary bug dust singly and analyze each index for achieving the purposes of stable quality of mixture,high efficiency of production and environmental protection.
Keywords:primary dust device  improved scheme  effect analysis  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号