首页 | 本学科首页   官方微博 | 高级检索  
     检索      

Fully Prefabricated Assembling Technology of Tsinghuayuan  Tunnel in Beijing Zhangjiakou High speed Railway(京张高铁清华园隧道轨下结构预制拼装技术)
引用本文:LYU Gang,LIU Jianyou,ZHAO Yong,LIU Fang,WANG Zhiwei.Fully Prefabricated Assembling Technology of Tsinghuayuan  Tunnel in Beijing Zhangjiakou High speed Railway(京张高铁清华园隧道轨下结构预制拼装技术)[J].隧道建设,2019,39(8):1357-1364.
作者姓名:LYU Gang  LIU Jianyou  ZHAO Yong  LIU Fang  WANG Zhiwei
作者单位:(1. China Railway Engineering Consulting Group Co., Ltd., Beijing 100055, China;  2. China Railway Economic and Planing Research Institute, Beijing 100844, China;  3. China Academy of Railway Sciences Corporation Limited, Beijing 100081, China)
摘    要:Tsinghuayuan Tunnel of Beijing Zhangjiakou High speed Railway is the first fully prefabricated high speed railway tunnel in China. The supporting structure, subrail structure, and subsidiary structure of Tsinghuayuan Tunnel are all prefabricated in the factory. The strength, deformation and stability of subrail structure are analyzed by numerical simulation method; a kind of three block type of subrail prefabricated structure is put forward according to prefabricated assembling technology; and the subrail space is used to ventilate and rescue under the stability condition. The connection between subrail structure and shield segment is the key to fully prefabricated assembling technology. By introducing the grouting technology and construction keys of subrail structure, the stress on subrail structure and shield segment can be balanced. The results can provide reference for similar projects in the future.

关 键 词:high  speed  railway  tunnel  prefabricated  assembling  technology  shield  tunnel  subrail  structure  grouting  
收稿时间:2019-02-27
点击此处可从《隧道建设》浏览原始摘要信息
点击此处可从《隧道建设》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号