首页 | 本学科首页   官方微博 | 高级检索  
     

接触网上部结构整体到位施工工法
引用本文:李国华. 接触网上部结构整体到位施工工法[J]. 铁道标准设计通讯, 2004, 0(5): 94-97
作者姓名:李国华
作者单位:中铁十三局集团电务工程有限公司 天津300232
摘    要:为适应高速电气化铁路发展 ,采取上部结构整体到位施工方法 ,改善弓网关系 ,提高机车受流质量 ,在城市轻轨列车、新建电气化铁路、非电气化营业线进行电气化改造及各种专用线电气化接触网施工中均可应用

关 键 词:电气化铁路  接触网  上部结构  整体到位  工法
文章编号:1004-2954(2004)05-0094-03
修稿时间:2003-12-17

Construction Method for Integral Superstructure of Catenary
Li Guohua. Construction Method for Integral Superstructure of Catenary[J]. Railway Standard Design, 2004, 0(5): 94-97
Authors:Li Guohua
Abstract:To the demand of development of high speed electrified railway, the construction method of integral superstructure of catenary was used to improve pantograph|contact line relation, and to improve current|receiving quality of locomotives. The method may be used for urban light rail, newly built electrified railway, electrification upgrading of existing railways, and various types of dedicated railways.
Keywords:electrified railway  overhead contact line   superstructure   integrally in place   construction method
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号