首页 | 本学科首页   官方微博 | 高级检索  
     检索      

南水北调中线一期工程南沙河倒虹吸中几个方案的选定
引用本文:孙明权,尚伯忠.南水北调中线一期工程南沙河倒虹吸中几个方案的选定[J].中国水运,2007,7(10):140-141.
作者姓名:孙明权  尚伯忠
作者单位:华北水利水电学院,华北水利水电学院
摘    要:本文简明阐述了南水北调中线一期工程河北省南沙河倒虹吸段设计中主要建筑物型式的选择,通过对比不同方案,找到各自的优缺点,从而选定最优方案,在保证工程质量和可靠度的情况下,节省了投资,缩短了工期。

关 键 词:南水北调  倒虹吸  方案
文章编号:1006-7973(2007)10-0140-02
修稿时间:2007年6月29日

South a northward rerouting of southern river median line issue of project in Shahe inverted siphon several plan designations
Sun Mingquan,Shang Bozhong.South a northward rerouting of southern river median line issue of project in Shahe inverted siphon several plan designations[J].China Water Transport,2007,7(10):140-141.
Authors:Sun Mingquan  Shang Bozhong
Institution:Sun Mingquan Shang Bozhong
Abstract:This article elaborated concisely south a northward rerouting of southern river median line issue of project Hebei Province in Shahe inverted siphon section design main building pattern choice, through the contrast different plan, found respective good and bad points, thus designated the synergy, in the guarantee project quality and in the margin of safety situation, has saved the investment, reduced the time limit for a project.
Keywords:Northward rerouting of southern river Inverted siphon Plan
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号