印尼某电站码头工程泊位长度优化分析
引用本文:刘奇虎.印尼某电站码头工程泊位长度优化分析[J].港工技术,2014(4):10-11.
作者姓名:刘奇虎
作者单位:中国港湾工程有限责任公司,北京100027
摘    要:本文通过介绍印度尼西亚某电站码头工程卸煤码头泊位长度投标长度和施工图批准的泊位长度的优化对比,从侧面来说明在国外实施项目,尤其是EPC项目,不仅要将中国的规范和标准推向世界,更需要彻底调查和准确掌握当地市场情况,将中国规范结合当地实际情况来降低实施项目的风险并获得较好的经济效益。

关 键 词:电站  码头  设计船型  泊位长度

Analysis of Berth Length Optimization of Indonesia Power Plant Terminal Project
Liu Qihu.Analysis of Berth Length Optimization of Indonesia Power Plant Terminal Project[J].Port Engineering Technology,2014(4):10-11.
Authors:Liu Qihu
Institution:Liu Qihu (China Harbour Engineering Co., Ltd., Beijing100027, China)
Abstract:Based on one power plant terminal project in Indonesia, the length of coal unloading berth in the bidding document is compared with the optimized length that is approved in the detailed design, which shows otherwise that the execution of overseas projects, especially EPC projects, require not only the promotion of China standards and codes to the world, but also the thorough investigation and exact grasp of local market, China standards must combine with local conditions to reduce the project risk and gain higher economic benefit
Keywords:power plant  terminal  design shipform  berth length