榕江特大桥悬拼架设临时加强措施设计
引用本文:蔡禄荣,李家茂,王钰,王荣辉.榕江特大桥悬拼架设临时加强措施设计[J].桥梁建设,2012,42(1):90-95.
作者姓名:蔡禄荣  李家茂  王钰  王荣辉
作者单位:1. 华南理工大学土木与交通学院,广东广州,510640
2. 中铁十三局集团第三工程有限公司,辽宁沈阳,110043
基金项目:国家自然科学基金资助项目(50978105);广东省交通厅科技项目(2007-15)~~
摘    要:为解决厦门至深圳客运专线榕江特大桥主跨高空悬臂拼装架设过程中局部杆件承载力不足且需要加强杆件较分散地分布于全桥的问题,根据钢桁梁桥的连接特点,采用一种新型的临时加强措施.通过建立全桥各施工阶段有限元模型,计算各杆件受力情况及结构整体稳定性,根据杆件受力情况决定对受力不利杆件采用以下加强措施:对薄弱斜腹杆附加一T形截面杆件,对较薄弱的下弦杆附加一H形截面杆件,加强杆件和被加强杆件共用螺栓连接副.该加强措施具有可由工厂统一加工、易安装且方便拆除,加强杆件与主桁结构协同工作性能较好等优点.

关 键 词:桁梁  拱桥  悬臂拼装架桥  临时  措施  设计

Design of Temporary Stiffening Measures for Cantilever Assembling and Erection of Rongjiang Rivre Bridge
CAI Lu-rong , LI Jia-mao , WANG Yu , WANG Rong-hui.Design of Temporary Stiffening Measures for Cantilever Assembling and Erection of Rongjiang Rivre Bridge[J].Bridge Construction,2012,42(1):90-95.
Authors:CAI Lu-rong  LI Jia-mao  WANG Yu  WANG Rong-hui
Institution:1(1.School of Civil Engineering and Transportation,South China University of Technology, Guangzhou 510640,China;2.The 3rd Engineering Co.,Ltd.,China Railway Shisanju Civil Engineering Group,Shenyang 110043,China)
Abstract:To cope with the problem that the bearing capacity of local members of the main span of Rongjiang River Bridge on Xiamen-Shenzhen Passenger Dedicated Railway was not sufficient in the process of the cantilever assembling and erection high above ground and the members that needed to be stiffened were widely scattered on the whole bridge,a new type of temporary stiffening measures was put forward and employed in the light of the connection characteristics of steel truss girder bridge.By establishing the finite element models for various construction stages of the whole bridge,the force conditions of all members and the global structural stability were calculated and according to the calculation,it was determined that the members that would sustain the unfavorable forces should be stiffened by the following measures: for a weak inclined web member,the T-section member was added and for a weak lower chord,the H-section member was added.The members to be stiffened and the stiffening members were connected by bolt sets.The stiffening members can be fabricated is shop,are easy to be installed and removed and have good joint action with the main truss structure.
Keywords:truss girder  arch bridge  cantilever assembling and erection of bridge  temporary  measure  design