首页 | 本学科首页   官方微博 | 高级检索  
     检索      

城轨交通机电系统集成施工总承包模式的探讨
引用本文:孙金科.城轨交通机电系统集成施工总承包模式的探讨[J].铁路工程造价管理,2014(1):55-59.
作者姓名:孙金科
作者单位:中铁电气化局集团有限公司,北京100036
摘    要:城轨交通机电系统以往都是按系统划分进行设计和施工的,效率低,建设工期长。随着科学技术的发展和设计施工手段的提高,工程建设模式逐步由非专业化向专业化、集成化和社会化方向转变和发展。在开展机电系统综合集成设计的同时,如何根据个系统设计内容、施工流程,采用先进的施工技术、工艺和手段,实现机电系统集成施工总承包进行探讨,并提出相关实施性建议。

关 键 词:城轨交通工程  机电系统  集成  建设模式  施工承包

Discussion of Urban Rail Transit Mechanical and Electrical System Integration Construction General Contracting Mode
Abstract:In the past, the mechanical and electrical system of urban rail transit are divided according to system to carry on the design and construction, which has low efficiency and long construction period. With the de- velopment of science and technology and the improvement of design and construction methods, construc- tion mode gradually changed and developed from non - specialization to specialization, integration and socialization. While carrying on mechanical and electrical system integrated design, how to realize con- struction general contracting for the mechanical and electrical system integration according to the system design content, construction process, the use of advanced construction technology, process and method are discussed, and related suggestions are puts forward.
Keywords:Urban rail transit engineering  Mechanical and electrical systems  Integration  Construction mode  Construction contract
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号