首页 | 本学科首页   官方微博 | 高级检索  
     检索      

车辆段接管期间存在问题与处理
引用本文:白季波,陈雪峰.车辆段接管期间存在问题与处理[J].现代城市轨道交通,2013(2):88-90.
作者姓名:白季波  陈雪峰
作者单位:成都地铁运营有限公司,助理工程师,四川成都 610081
摘    要:结合成都地铁1号线皂角树车辆段、2号线洪柳车辆段在运营前接管期间出现的影响安全生产、设备设施调试、人员管理等问题,分析地铁车辆段在接管期间产生问题的原因并提出解决方法。对地铁试运营的顺利开通具有十分重要的意义。

关 键 词:地铁  车辆段  接管期  问题

Problems and Actions Taken during Depot Takeover Period
Bai Jibo,Chen Xuefeng.Problems and Actions Taken during Depot Takeover Period[J].Modern Urban Transit,2013(2):88-90.
Authors:Bai Jibo  Chen Xuefeng
Institution:Bai Jibo, Chen Xuefeng
Abstract:By taking into consideration of Zaojiaoshu depot on Chengdu metro line 1 and Hongliu depot on line 2, the paper describes the problems occurred during takeover period before commercial operations, which have impact on production safety, commissioning of equipment and facilities, personnel management etc. It makes analysis on the problems occurred in metro depot during the takeover and the causes and it puts forward some solutions.
Keywords:metro  depot  period of takeover  problem
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号