明挖、盾构隧道综合接地设计方案研究 |
| |
引用本文: | 迟晓华.明挖、盾构隧道综合接地设计方案研究[J].铁道通信信号,2009,45(10):21-23. |
| |
作者姓名: | 迟晓华 |
| |
作者单位: | 铁道第三勘察设计院集团有限公司,300251,天津 |
| |
摘 要: | 结合工程设计实际情况,对铁道部规定的综合接地设计方案中没有明确的明挖隧道、盾构隧道的综合接地方案进行了研究,可供相关项目借鉴。
|
关 键 词: | 隧道 综合接地 方案 |
Integrated Earthing Design Schema for Open-digged and Shield-digged Tunnel |
| |
Abstract: | Based on actual engineering design experience, the article studies integrated earthing scheme for open-dig tunnel and shield-dig tunnel, which are not included in the MOR standard and can be use as reference for other similar projects. |
| |
Keywords: | Tunnel Integrated earthing Solution |
本文献已被 维普 万方数据 等数据库收录! |