相对标高法立模在西江大桥施工中的应用
引用本文:任国旭.相对标高法立模在西江大桥施工中的应用[J].公路,2004(8):274-275.
作者姓名:任国旭
作者单位:广东冠粤路桥有限公司,广州市,510310
摘    要:西江大桥施工监控过程中,在长悬臂施工状态下,采用相对标高法立模,尽量消除温度对立模标高的影响以及在实际工程中取得的效果。

关 键 词:西江大桥  施工监控  相对标高法  温度
文章编号:0451-0712(2004)08-0274-02

Application of Formwork Erected with Relative Elevation Method to Construction of A Long Span Bridge over Xijing River
REN Guo-xu.Application of Formwork Erected with Relative Elevation Method to Construction of A Long Span Bridge over Xijing River[J].Highway,2004(8):274-275.
Authors:REN Guo-xu
Abstract:During the construction monitoring on a long span bridge over Xijiang River, formwork erected with relative elevation method under the condition of long cantilever construction are adopted which can remove temperature's effect on closed elevation to the full and effects gained in the practical engineering application are introduced in this paper.
Keywords:Long Span Bridge over Xijiang River  construction monitoring  relative elevation method  temperature  