首页 | 本学科首页   官方微博 | 高级检索  
     检索      

PHC静压管桩在铁路制梁场施工中的应用
引用本文:刘东宁.PHC静压管桩在铁路制梁场施工中的应用[J].中国港湾建设,2011(4):54-55.
作者姓名:刘东宁
作者单位:中交哈大铁路工程指挥部,吉林长春,130033
摘    要:为了解决梁场地基处理施工方案中钻孔桩冬季施工、环境污染、投人大等问题,在哈大铁路客运专线24号梁场地基处理中采用了高强预应力管桩(PHC)。实施结果表明,PHC管桩较钻孔灌注桩、人工挖孔桩具有施丁速度快,受冬季气温低、场地限制影响小,工厂预制且工艺成熟,对环境造成的污染小,成本低等优势,在梁场建设中可以大面积推广应用。

关 键 词:PHC静压管桩  制梁场  施工应用

Applications of PHC Plenum Pipe Piles in Railway Precasting Yard
LIU Dong-ning.Applications of PHC Plenum Pipe Piles in Railway Precasting Yard[J].China Harbour Engineering,2011(4):54-55.
Authors:LIU Dong-ning
Institution:LIU Dong-ning(CCCC Harbin-Dalian Railway Passenger Transport Engineering Headquarters,Changchun,Jilin 130033,China)
Abstract:In order to solve the problems of winter construction,environmental pollution,and big investment of drill pile in precast yard sub-grade treatment,adopted high strength pre-stress pipe pile in No.24 precast yard in Hada Railway Special Line.Practice shows that the PHC pipe pile is more mature than drill cast-in-place pile and manual drill pile.It is precasted in factory and constructed fast,and the cold weather in winter and yard limit make few influence to PHC.The PHC also has the advantages of little envi...
Keywords:PHC plenum pipe piles  precasting yard  construction application  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号