首页 | 本学科首页   官方微博 | 高级检索  
     检索      

曹妃甸港煤码头装卸系统空载联动试运转技术
引用本文:张德全.曹妃甸港煤码头装卸系统空载联动试运转技术[J].中国港湾建设,2011(5):80-84.
作者姓名:张德全
作者单位:中交第一航务工程局有限公司,天津,300461
摘    要:详细介绍了曹妃甸煤码头工程装卸机械设备系统空载联动试运转技术,结合卸车堆料流程和取料装船流程进行论述。在实施中空载联动试运转安全可靠、安装质量符合国家规范,性能参数满足技术规格书要求,达到了工期目标。

关 键 词:煤码头  装卸系统  联动  试运转  流程

Technology of No-load Commissioning of Handling Equipment at Caofeidian Coal Terminal
ZHANG De-quan.Technology of No-load Commissioning of Handling Equipment at Caofeidian Coal Terminal[J].China Harbour Engineering,2011(5):80-84.
Authors:ZHANG De-quan
Institution:ZHANG De-quan(CCCC First Harbor Engineering Co.,Ltd.,Tianjin 300461,China)
Abstract:The paper gives a detailed introduction to the technology of no-load commissioning of handling equipment at Caofeidian Coal Terminal by expounding on the technological process of unloading and stacking as well as reclaiming and ship-loading.The no-load commissioning was run safely and reliably,the quality of installation met the national standards,and the performance parameters met the requirements specified in the technical specifications,achieving the scheduled goal of the project.
Keywords:coal terminal  commissioning  technological process  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号