首页 | 本学科首页   官方微博 | 高级检索  
     

高桩码头锚杆嵌岩桩终孔措施
引用本文:林小琳,虞红海. 高桩码头锚杆嵌岩桩终孔措施[J]. 水运工程, 2006, 0(1): 44-46
作者姓名:林小琳  虞红海
作者单位:宁波港建设开发总公司,浙江,宁波,315800
摘    要:通过工程实践,分析高桩码头锚杆嵌岩桩终孔措施,以确保桩基承载力满足设计要求。

关 键 词:高桩码头  锚杆嵌岩桩  终孔措施  桩基承载力
文章编号:002-4972(2006)00-0044-03
收稿时间:2005-08-17
修稿时间:2005-08-17

Termination Measures for Anchor-rod Rock-socketed Piles of High-piled Wharf
LIN Xiao-lin,YU Hong-hai. Termination Measures for Anchor-rod Rock-socketed Piles of High-piled Wharf[J]. Port & Waterway Engineering, 2006, 0(1): 44-46
Authors:LIN Xiao-lin  YU Hong-hai
Affiliation:Ningbo Port Cosntruetion Development Corporation, Ningbo 315800, China
Abstract:This paper analyzes the termination measures for anchor-rod rock-socketed piles of high-piled wharf combining with an engineering practice,to ensure that the bearing capacity of pile foundation satisfies the design requirement.
Keywords:high-piled wharf  anchor-rod rock-socketed pile  termination measure  bearing capacity of pile foundation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号