首页 | 本学科首页   官方微博 | 高级检索  
     检索      

FPSO改装项目内部转塔系统及安装工艺
引用本文:柴文涛.FPSO改装项目内部转塔系统及安装工艺[J].造船技术,2020(2):62-64.
作者姓名:柴文涛
作者单位:上海华润大东船务工程有限公司
摘    要:简单介绍浮式生产储油装置(Floating Production Storage and Offloading,FPSO)改装项目,较详细地阐述该FPSO改装项目上的内部转塔系统及其安装工艺,以此对未来这一领域的发展提供安装工艺方面的指导和说明。

关 键 词:FPSO  内部转塔系统  转塔轴  安装工艺

Internal Turret Mooring System and Its Installation Process of FPSO Refitting Project
CHAI Wentao.Internal Turret Mooring System and Its Installation Process of FPSO Refitting Project[J].Journal of Marine Technology,2020(2):62-64.
Authors:CHAI Wentao
Institution:(Huarun Dadong Dockyard Co.,Ltd.,Shanghai 202155,China)
Abstract:The FPSO refitting project is briefly introduced, and the internal turret system and its installation process are elaborated in detail, in order to provide guidance and explanation for the future development of this field.
Keywords:FPSO  internal turret mooring system  turret shaft  installation process
本文献已被 CNKI 维普 等数据库收录!
点击此处可从《造船技术》浏览原始摘要信息
点击此处可从《造船技术》下载免费的PDF全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号