首页 | 本学科首页   官方微博 | 高级检索  
     检索      

西安铁路枢纽新丰站上行出发场过渡施工方案
引用本文:汤隆波.西安铁路枢纽新丰站上行出发场过渡施工方案[J].电气化铁道,2009(2):31-32,35.
作者姓名:汤隆波
作者单位:中铁电气化局集团有限公司西安电化公司,陕西宝鸡,721000
摘    要:就西安铁路枢纽新丰编组站上行出发场过渡开通的接触网施工方案进行阐述,通过与传统过渡施工方案的对比,在满足工程需要的前提下,选择简单、经济的过渡施工方案,对其他类似枢纽站场施工有一定的指导意义。

关 键 词:铁路枢纽  出发场  过渡施工  方案

Transient Construction Plan of Departure Yard on Up Line of Xinfeng Station in Xi'an Railway Terminal
Tang Longbo.Transient Construction Plan of Departure Yard on Up Line of Xinfeng Station in Xi'an Railway Terminal[J].Electric Railway,2009(2):31-32,35.
Authors:Tang Longbo
Abstract:We expound the transition working scheme about the contact wire in the upline setting out section Xi'an railway pivot Xinfeng station. By means of contrasting the traditional transition working scheme, we can choose simple and economical scheme to meet the project requirements. This scheme can guide other similar pivot section working in some dregree.
Keywords:railway pivot  upline setting out section  transition working  scheme  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号