长江中游藕池口水道二期工程治理方案及效果
引用本文:岳志远,付中敏,耿佳良,刘奇峰,刘怀汉. 长江中游藕池口水道二期工程治理方案及效果[J]. 水运工程, 2015, 0(1): 139-144
作者姓名:岳志远  付中敏  耿佳良  刘奇峰  刘怀汉
作者单位:长江航道规划设计研究院,湖北 武汉 430011;长江航道规划设计研究院,湖北 武汉 430011;长江航道规划设计研究院,湖北 武汉 430011;长江航道规划设计研究院,湖北 武汉 430011;长江航道规划设计研究院,湖北 武汉 430011
摘    要:藕池口水道是长江中游重点碍航浅水道之一,航道整治一期工程实施后,初步稳定了河道滩槽格局,枯水航道条件有所改善。但是,一期工程并未能充分控制航槽边界、岸边界及主要滩体,航道仍然存在不稳定因素,因此,尚须实施二期整治工程。对二期工程建设提出的2个设计方案分别进行模型试验研究,分析其工程整治效果,为设计方案的选取提供科学依据。

关 键 词:藕池口水道;治理方案;二期工程;工程效果

Regulation scheme and effect of the second phase project of Ouchikou waterway on the middle reach of the Yangtze River
YUE Zhi-yuan,FU Zhong-min,GENG Jia-liang,LIU Qi-feng and LIU Huai-han. Regulation scheme and effect of the second phase project of Ouchikou waterway on the middle reach of the Yangtze River[J]. Port & Waterway Engineering, 2015, 0(1): 139-144
Authors:YUE Zhi-yuan  FU Zhong-min  GENG Jia-liang  LIU Qi-feng  LIU Huai-han
Affiliation:Changjiang Waterway Planning,Design and Research Institute,Wuhan 430011,China;Changjiang Waterway Planning,Design and Research Institute,Wuhan 430011,China;Changjiang Waterway Planning,Design and Research Institute,Wuhan 430011,China;Changjiang Waterway Planning,Design and Research Institute,Wuhan 430011,China;Changjiang Waterway Planning,Design and Research Institute,Wuhan 430011,China
Abstract:The Ouchikou waterway is one of navigation obstruct rivers on the middle Yangtze River.The first phase of the project initially stabilizes the pattern of the breach and slot through,which ensures excellent channel condition during the dry period.However,the first phase of the project may not adequately control the navigation trough boundary,and unstable factors exist in the channel river,so it is necessary to implement the second phase of the project.Two schemes for the second phase of the project are presented,which are studied respectively by physical modeling.The comparison and analysis for the engineering effects may contribute to choosing the engineering scheme.
Keywords:Ouchikou channel  regulation scheme  the second phase of the project  engineering effect
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水运工程》浏览原始摘要信息
点击此处可从《水运工程》下载免费的PDF全文