拼装虚托对装配式顶拱结构的力学影响
引用本文:彭智勇,杨秀仁,王 臣,杨 明.拼装虚托对装配式顶拱结构的力学影响[J].都市快轨交通,2023,36(2):107-111.
作者姓名:彭智勇  杨秀仁  王 臣  杨 明
作者单位:城市轨道交通绿色与安全建造技术国家工程研究中心,北京城建设计发展集团股份有限公司
摘    要:在装配式双构件顶拱结构的实际拼装过程中,因托拱千斤顶行程不同步,易导致千斤顶虚托现象发生。基于三维数值计算,分析不同虚托条件下装配式双构件顶拱结构的力学性能,并依据最大主应力失效准则,完成不同虚托状态下装配式顶拱结构的力学性能评价。研究分析发现:上部承托平台虚托时,结构内部最大主应力向压应力趋势发展;下部承托平台虚托时,结构内部的最大主应力向拉应力趋势发展;仅上部承托平台虚托时,装配式双构件顶拱结构主体均满足最大主应力抗拉设计限值;出现任一下部承托平台虚托时,装配式双构件顶拱结构局部区域不满足最大主应力抗拉设计限值。

关 键 词:轨道交通  装配式地铁车站  双构件顶拱结构  顶拱拼装  千斤顶虚托

Mechanical Influences of Empty Support on Prefabricated Arch Structures
PENG Zhiyong,YANG Xiuren,WANG Chen,YANG Ming.Mechanical Influences of Empty Support on Prefabricated Arch Structures[J].Urban Rapid Rail Transit,2023,36(2):107-111.
Authors:PENG Zhiyong  YANG Xiuren  WANG Chen  YANG Ming
Institution:National Engineering Research Center for Green and Safe Construction Technology in Urban Rail Transit, Beijing Urban Construction Design and Development Group Co., Ltd.
Abstract:In the assembly of a prefabricated double-member arch structure, a jack empty support phenomenon is easily caused by stroke asynchronism. Based on a three-dimensional numerical calculation, this study investigated the different empty supports fabricated under the condition of a double-component top arch structure and their mechanical properties, and on the basis of maximum principal stress failure criterion, analyzed the different empty mechanical properties of a fabricated under-roof arch structure. Evaluation, research, and analysis found that: (1) when the upper supporting platform is in empty support, the maximum principal stress in the structure is compressive stress; (2) when the lower supporting platform is in empty support, the maximum principal stress in the structure is tensile stress; (3) when only the upper supporting platform is in empty support, the main body of the prefabricated double-member top arch structure meets the maximum principal stress tensile design limit; and (4) when there is an empty support in the lower supporting platform, the partial area of the prefabricated double-member top arch structure does not meet the maximum principal stress tensile design limit.
Keywords:rail transit  prefabricated metro station  top arch construction with double block  assembled crown  empty support about jack