The significance of the Tianjin metro line 1 and its general rout situations are introduced in detail. The
charateristics and difficulties of this engineering are reviewed through the introduction of the rebuild-
ing engineering of the existing line and the deep foundation pit engineering of new building segment.
Some new technologies, new equipments and new techniques are also introduced.