首页 | 本学科首页   官方微博 | 高级检索  
     检索      

铁路建设项目甲供物资价差计算方法优选
引用本文:黄丁根.铁路建设项目甲供物资价差计算方法优选[J].铁路工程造价管理,2011,26(2):7-8,12.
作者姓名:黄丁根
作者单位:南昌铁路局基建处,江西南昌,335000
摘    要:铁路建设项目重要物资实行甲供方式后,其价差可上报要求批准追加工程造价,如何合理选择价差计算方法对风险合理分摊、优化工程造价控制至关重要.此文提出4种主要的甲供物资价差调整计算方法,对其中3种方法进行深入阐述和分析,提出在既有方法基础上的优先方案,供实际工作中具体运用.

关 键 词:甲供物资  价差  计算方法  优选

Optimization of Methods for Calculating Price Difference of Owner Supply Materials in Railway Construction Projects
Huang Dinggen.Optimization of Methods for Calculating Price Difference of Owner Supply Materials in Railway Construction Projects[J].Railway Engineering Cost Management,2011,26(2):7-8,12.
Authors:Huang Dinggen
Abstract:After important materials are supplied by owners in railway construction projects,the engineering cost can be adjusted by getting the approval of the charging unit to make up the price difference of such materials.Therefore,it is important to appropriately allocate risks and optimize the engineering cost control by selecting the right method for calculating the price difference.This paper proposes four main types of methods for calculating the price difference of owner supply materials,and deeply investigat...
Keywords:Owner supply material  price difference  calculation method  optimization  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号