浅谈外海大潮差地区水下大型软体排铺设工艺的改进
引用本文:钱华伟,荣万岭,冯朋.浅谈外海大潮差地区水下大型软体排铺设工艺的改进[J].港工技术,2011,48(2):37-39.
作者姓名:钱华伟  荣万岭  冯朋
作者单位:中交第二航务工程局第三工程有限公司,江苏镇江,212003
摘    要:以南通洋口港区人工岛围堤工程为例,介绍水下大型软体排的组成结构、材料选取和设计方法的要点,并重点探讨如何改进在复杂工况条件下铺设水下大型软体排的施工工艺和船机配备.实践证明,改进后的软体排铺设工艺与传统施工工艺相比,既提高了施工效率,又确保了工程质量.

关 键 词:洋口港区  人工岛  软体排  施工工艺  工效

Improvement on Laying Technology of Underwater Large-scale Soft Mattress within Open Sea Macro-tidal Range Area
Qian Huawei,Rong Wanling,Feng Peng.Improvement on Laying Technology of Underwater Large-scale Soft Mattress within Open Sea Macro-tidal Range Area[J].Port Engineering Technology,2011,48(2):37-39.
Authors:Qian Huawei  Rong Wanling  Feng Peng
Institution:(No.3 Engineering Co.,Ltd.,CCCC Second Harbor Engineering Co.,Ltd.,Zhenjiang Jiangsu 212003,China)
Abstract:The retaining dike project of man-made island in Nantong Yangkou Port Area is taken as an instance to introduce the structure,material selection and design method of underwater large-scale soft mattress.In addition,it is discussed as an important issue the method to improve the construction technology and ship machine allocation for laying underwater large-scale soft mattress under complicated work conditions.The practice shows that the improved soft mattress laying technology can raise construction efficiency and guaranteed project quality in comparison with the traditional technology.
Keywords:Yangkou Port Area  man-made island  soft mattress  construction technology  work efficiency