首页 | 本学科首页   官方微博 | 高级检索  
     检索      

复杂条件下海底隧道全断面帷幕注浆技术研究
引用本文:王彦启.复杂条件下海底隧道全断面帷幕注浆技术研究[J].铁道建筑技术,2009(7):82-85.
作者姓名:王彦启
作者单位:中铁二十二局集团第三工程有限公司,福建厦门,361100
摘    要:厦门翔安海底隧道是我国大陆地区第一座海底隧道。隧道所处地段地质条件复杂,海域地段存在多处风化深槽,岩体主要为全强风化花岗岩,岩体强度低、自稳能力差,安全穿越风化槽是隧道施工的难点。结合实际施工情况对全断面帷幕注浆技术进行阐述。

关 键 词:海底隧道  风化槽  帷幕注浆  施工技术

Researches on Full-face Curtain Grouting Technology of Subsea Tunnel under Complex Conditions
Wang Yanqi.Researches on Full-face Curtain Grouting Technology of Subsea Tunnel under Complex Conditions[J].Railway Construction Technology,2009(7):82-85.
Authors:Wang Yanqi
Institution:Wang Yanqi ( China Railway 22th Bureau Group Co. Ltd. , Xiamen 361100, China)
Abstract:Xiamen Xiangan Subsea Tunnel is the first subsea tunnel in mainland China. Its geological conditions are com-plex, as there are many weathered troughs in the costal sections. The surrounding stone mainly consists of the completely weathered granite, the intensity of which is low, the self-steady ability of which is weak. It is difficult to construct the sub-sea tunnel through the weathered trough safely. This paper will discuss the full-face curtain grouting technology according to geological conditions.
Keywords:subsea tunnels  weathered trough  ettrtain grouting  construction technology
本文献已被 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号