首页 | 本学科首页   官方微博 | 高级检索  
     

贵阳白布矿井(二期)下穿铁路安全风险评估
作者单位:;1.武汉铁四院工程咨询有限公司
摘    要:织金至毕节铁路从白布矿井(二期)井田中西部穿过,为确定井筒的本身结构是否安全,井筒施工是否会危及铁路的安全,煤矿在开采期间是否对铁路造成影响,通过模型计算及风险源识别评估分析,结果表明,矿井下穿铁路设计方案合理安全。

关 键 词:矿井  下穿  铁路  安全  风险评估

Risk Assessment of Guiyang Calico Mine (Second Phase) Passing under Railway
Affiliation:,Wuhan Tiesiyuan Engineering Consulting Co.Ltd.
Abstract:Zhijin to Bijie railway( phase II) passes calico mine from mid-west. To ensure the safety of the well bore structure,determine the impact of shaft construction on railway operation,and the impact of coal mine excavation on the railway,model calculation and identification of risk source analysis and evaluation are conducted. The results show that the mine passing under the railway is reasonable and safe.
Keywords:Mine  Under passing  Railway  Safety  Risk assessment
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号