首页 | 本学科首页   官方微博 | 高级检索  
     检索      

格库铁路南山口站至格尔木站间列控系统方案研究
作者单位:;1.中铁第一勘察设计院集团有限公司
摘    要:通过提出格库铁路南山口站至格尔木站间ITCS系统和CTCS-0系统覆盖范围不同的3种方案,并从ITCS系统和CTCS-0系统工程实施内容、车载系统配置、行车列控模式切换、司乘人员操作控制、工程投资等方面进行对比分析研究,得出适合格库铁路南山口至格尔木间的列控系统方案,从而解决格库铁路引入格尔木枢纽,与既有青藏铁路格拉段南山口站至格尔木站间的格尔木河线路所交汇,引起上述两种列控系统在格尔木枢纽地区交叉重叠引起的列控系统兼容问题。

关 键 词:格库铁路  青藏铁路  列控系统  方案研究

Research on Train Control System between NanshanKou Station and Golmud Station on Golmud-Korla Railway
Institution:,China Railway First Survey and Design Institute Group Co.Ltd.
Abstract:This paper puts forward three kinds of solution with different coverage areas for ITCS system and CTCS-0 system applied to the section between line Nanshan Kou railway station and Golmud station on Golmud-Korla railway,and also conducts comparative analysis and research on ITCS system and CTCS-0system in many different aspects such as project works,On-board system configuration,switching of train control mode,train driver operation and control,engineering investment and etc. It concludes a train control plan adaptable to the section between Nanshan Kou railway station and Golmud station on Golmud- Korla railway,and the compatibility issue resulted from the overlapping of the two kinds of train control systems in Golmud railway hub area as Golmud- Korla railway is introduced into Golmud railway hub,and joins with Golmud river railway line between Nanshan Kou station and Golmud station on Golmud-lasa section of Qinghai- Tibet Railway can be fixed.
Keywords:Golmud-Korla railway  Qinghai-Tibet railway  Train control system  Scheme research
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号