首页 | 本学科首页   官方微博 | 高级检索  
     检索      

洋山深水港区二期水工码头大口径嵌岩桩施工工艺
引用本文:吴鹏程.洋山深水港区二期水工码头大口径嵌岩桩施工工艺[J].港口科技,2007(9):21-25.
作者姓名:吴鹏程
作者单位:上海港务工程公司,上海,200438
摘    要:介绍了洋山深水港区二期水工码头大口径嵌岩桩的主要施工工艺及控制要求。阐述了其施工难点及处理措施,并对桩身质量检测项目和结果作一叙述。最后指出:要确保钻孔嵌岩桩的施工质量,其关键在于有效管理,施工人员的高度责任心,以防为主,精心施工。

关 键 词:洋山深水港  嵌岩桩  施工工艺

The Constructive Technology of Large Calibre Rock- Socketed Pile in the Yangshan Deep Water Port District (Phase 2)
Wu Pengcheng.The Constructive Technology of Large Calibre Rock- Socketed Pile in the Yangshan Deep Water Port District (Phase 2)[J].Science & Technology of Ports,2007(9):21-25.
Authors:Wu Pengcheng
Institution:Shanghai Harbour Engineering Corporation, Shanghai 200438
Abstract:This paper introduces the main constructive technology of large caliber rock-socketed pile and its control demand in the Yangshan Deep Water Port District(Phase 2),states the difficulties during the construction and the measures could be taken,then introduces the checking on the pile and the results.It points out that in order to ensure the quality,people should pay great attention to the control and responsibility sense and constructing meticulously.
Keywords:Yangshan Deep Water Port District rock-socketed pile constructive technology
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号