首页 | 本学科首页   官方微博 | 高级检索  
     检索      

高速铁路接触网工程概算编制探讨
引用本文:王晓荣.高速铁路接触网工程概算编制探讨[J].铁路工程造价管理,2011,26(3):33-37.
作者姓名:王晓荣
作者单位:中铁第四勘察设计院集团公司工经处,湖北,武汉,430063
摘    要:随着对高速铁路认识的不断加深,作为高速铁路供电系统的主体接触网工程技术不断完善.此文从高速铁路接触网工程特点入手,结合实际工作中编制高速铁路接触网工程概算所遇到的问题,提出解决方法,并就如何客观实际地编制接触网工程概算的有关问题进行探讨.

关 键 词:高速铁路  接触网  概算编制

Discussion of the Estimate Making of the Catenary System of the High-speed Railways
Wang Xiaorong.Discussion of the Estimate Making of the Catenary System of the High-speed Railways[J].Railway Engineering Cost Management,2011,26(3):33-37.
Authors:Wang Xiaorong
Institution:Wang Xiaorong
Abstract:As the understanding of the high-speed railways deepens,the technique requirements of the catenary system of the high-speed railways are improving.Based on the characteristics of the catenary system of high-speed railways,this paper proposes the solutions to the problems in making the estimate of the catenary system of high-speed railways,and discusses the issues about how to make the estimate.
Keywords:high-speed railway  catenary system  estimate making  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号