首页 | 本学科首页   官方微博 | 高级检索  
     


A stochastic concession model for infrastructure projects under build-operate-transfer schemes
Authors:Yinghua Zhu  Feng Xu  Hao Hu
Affiliation:1.Stake Key Laboratory of Ocean Engineering; School of Naval Architecture, Ocean & Civil Engineering,Shanghai Jiaotong University,Shanghai,China
Abstract:Concession period is a key factor in the arrangement of a build-operate-transfer (BOT) contract. This paper proposes a stochastic concession period model for infrastructure projects under a BOT scheme, which takes into account the impact of risks and the risk attitudes of the private investor and the government. A hypothetical case is simulated by using the Monte Carlo simulation method to illustrate the proposed model. The results indicate that even for a project with the same estimations, the concession interval can be different and depends a lot on the risk attitudes of the private investor and the government. The proposed model provides a more reasonable concession interval based on which a specific concession period can be obtained through negotiation between the two parties.
Keywords:
本文献已被 CNKI SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号