首页 | 本学科首页   官方微博 | 高级检索  
     检索      

预应力CFRP板加固钢梁抗弯疲劳试验研究
引用本文:叶华文,T. Ummenhofer,强士中.预应力CFRP板加固钢梁抗弯疲劳试验研究[J].公路交通科技,2009,26(12).
作者姓名:叶华文  T. Ummenhofer  强士中
作者单位:1. 西南交通大学,土木工程学院,四川,成都,610031;Institute for Rehabilitation of Buildings and Structures, University of Braunschweig, Braunschweig 38106, Germany
2. Institute for Rehabilitation of Buildings and Structures, University of Braunschweig, Braunschweig 38106, Germany
3. 西南交通大学,土木工程学院,四川,成都,610031
基金项目:国家留学基金委资助项目 
摘    要:首先,采用修正的Pairs公式分析粘贴预应力CFRP板加固的钢构件的疲劳裂纹扩展行为.然后通过粘贴CFRP板的预制裂纹钢梁4点弯曲进行疲劳试验研究,最后基于阻止裂纹扩展的角度提出一种初步估计加固所需预应力大小的简化计算和设计方法.结果表明,粘贴预应力CFRP板对钢梁疲劳寿命的影响很大,与预制裂纹阶段比寿命提高最高可达10倍以上.不同的预制裂纹,同样的加固措施效果差别可达10倍.采用后张法施加预应力效果很好,锚固装置可以实时控制有效预应力,且预应力损失很小.

关 键 词:桥梁工程  加固  疲劳试验  预应力CFRP板  预应力损失

Experimental Study of Flexural Fatigue Performance of Steel Girder Reinforced by Prestressed CFRP Plate
YE Huawen,T. Ummenhofer,QIANG Shizhong.Experimental Study of Flexural Fatigue Performance of Steel Girder Reinforced by Prestressed CFRP Plate[J].Journal of Highway and Transportation Research and Development,2009,26(12).
Authors:YE Huawen  T Ummenhofer  QIANG Shizhong
Abstract:Bonding Prestressed carbon fiber reinforcement polyester (CFRP) plate is a promising technique to strengthen steel member damaged by fatigue. First, a modification of Paris' equation was used to analyze the crack propagation of the steel member strengthened by CFRP plate. Four-point bending fatigue test of pre-cracked steel girder strengthened with prestressed CFRP plates was also conducted to investigate the flexural fatigue performance of reinforced steel girder. In the end a simplified calculation and design method was also presented to estimate the re-quired prestress preliminary to stop the propagation of fatigue cracks. The result shows that (1) this technique pro-duces a significant increment of fatigue life of steel girder which is more than 10 times compared with that of pre-crack stage; (2) the fatigue lives, which extended from the reinforcement with different pre-crack sizes, differ up to 10 times. The post-tensioning method was applied to prestress the CFRP of steel girder plate successfully and an-chorage system can real-time control the prestress in CFRP plates and the prestress loss is slight.
Keywords:bridge engineering  reinforcement  fatigue test  prestressed CFRP plate  prestress loss
本文献已被 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号