福厦客专梁场建设关键技术
引用本文:魏存兰,王效有.福厦客专梁场建设关键技术[J].铁道建筑技术,2010(8):19-22.
作者姓名:魏存兰  王效有
作者单位:中铁二十一局集团有限公司,兰州,730000
摘    要:高速铁路客运专线的建设过程中,梁场设置的合理性会直接影响到高铁的建设工期、安全和质量。结合福厦客专双线整孔箱梁预制梁场的建设过程,从梁场选址、规划设计、生产技术措施、管理及质量安全保证体系等方面开展了梁场建设的关键技术总结,以期为今后高铁客专梁场的建设提供参考和借鉴。

关 键 词:客运专线  梁场建设  关键技术

Key Technology for Prefabricated Girder Yard Construction of Fu-xia Passenger Line
Wei Cunlan,Wang Xiaoyou.Key Technology for Prefabricated Girder Yard Construction of Fu-xia Passenger Line[J].Railway Construction Technology,2010(8):19-22.
Authors:Wei Cunlan  Wang Xiaoyou
Institution:(China Railway 21st Bureau Group Co. Ltd. , Lanzhou 730000, China)
Abstract:In the construction of high speed railway and passenger lines, the rationality of prefabricated girder yard location would affect the construction period, safety and quality. Associated with the whole box girder construction process of Fu-xia passenger double line, this paper summarizes the key technology in terms of girder yard location, project design, assembly and machine distribution, manufacturing technique, quality and safety system, and so on, aiming at supply references and ideas for future girder yard construction of high speed railway.
Keywords:passenger dedicated line  girder yard construction  key technology