首页 | 本学科首页   官方微博 | 高级检索  
     

以邢台东站为例谈既有站综合交通枢纽规划与改造提升
作者单位:;1.中铁第四勘察设计院集团有限公司
摘    要:随着既有站成为综合交通枢纽,需要对其进行规划和改造。以邢台东站为例,通过概况分析、客流量与规模预测,归纳邢台东站综合交通枢纽现状核心问题;通过思路比选,提出推荐研究思路,说明其规划设计要点,总结既有站综合交通枢纽规划改造的工作要点。

关 键 词:铁路客站  既有站  综合交通枢纽  规划  改造提升

Comprehensive Traffic Hub Planning and Renovation of Existing Rail Station Based on Xingtai East Railway Station
Affiliation:,China Railway Siyuan Survey and Design Group Co.,Ltd.
Abstract:To change an existing railway station to a comprehensive traffic hub,planning and renovation are required. Taking Xingtai East Railway Station as an example,this study concludes core issues of Xingtai east railway station traffic hub based on the analysis of the general situation and the forecast of passenger flow and construction scale, and puts forward recommended research concepts. It also illustrates key points of planning and designing and summarizes work focuses in planning and renovation of the existing comprehensive traffic hub.
Keywords:Railway Passenger Station  Existing railway station  Comprehensive traffic hub  Planning  Renovation
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号