更换支座状态下墩顶横隔梁的分析与设计 |
| |
引用本文: | 孙百凤,陈宇新,王琪,李文鑫.更换支座状态下墩顶横隔梁的分析与设计[J].北方交通,2011(6). |
| |
作者姓名: | 孙百凤 陈宇新 王琪 李文鑫 |
| |
作者单位: | 1. 抚顺县公路工程段,抚顺,113007 2. 辽宁省交通规划设计院,沈阳,110166 |
| |
摘 要: | 关门山大桥加固方案采用体系转换,即把双悬臂带挂梁的组合梁桥改变为连续梁桥,但体系转换后,为满足结构纵向变位的需要,在各墩顶需进行支座更换,更换支座需顶升主梁,对更换支座状态下墩顶横隔梁的受力分析及设计进行了详细介绍。
|
关 键 词: | 桥梁加固 更换支座 横隔梁 深梁 支顶 有限元 |
Analysis and Design on Diaphragm at Pier Top in the State of Bearing Replacement |
| |
Authors: | SUN Bai-feng others |
| |
Institution: | SUN Bai-feng and others |
| |
Abstract: | The Guanmenshan Bridge is reinforced by system transformation,that is to convert the composite beam bridge with double-cantilever-beam and suspended beam into the continuous beam bridge.But after the system transformation,the bearing should be replaced at the pier top to meet the needs of longitudinal elongation of structure.The main girder should be lifted up to replace the bearing.In the state of bearing replacement,force analysis and design of pier diaphragm are introduced in detail. |
| |
Keywords: | Bridge reinforcement Bearing replacement Diaphragm Deep beam Roof support Finite element |